11/25/2015

The gallery is up , work done through all that horrendous rain, now the ground in front is a mud bath and flags and turf need to be laid.

 

 

 

 

 

 

11/9/2015

 

 

 

 

 

 

 

 

Cocrete base down - the digger shovel just fitted between the 2 rowans and the boys slide was a perfect chute for the concrete!!!

10/20/2015

Land now ready for concrete base to be installed after a whole quarry of rocks removed to ensure the ground is flat enough. ETA for gallery is in 4-5 weeks -finger's crossed

9/15/2015

Our new Studio/Art Gallery in the garden is in its infancy -still in the design phase but trees, shrubs and flowers have been relocated to make room for the new venture. Awaiting a digger to remove some of a hill, then a waller to move the dry stone wall back and then...

Please reload

 blog 

© 2023 by Mission Gallery. Proudly created with Wix.com 

500 Terry Francois St. San Francisco, CA 94158

  • Facebook Clean
  • Twitter Clean
This site was designed with the
.com
website builder. Create your website today.
Start Now